JOIN US

Industrial Project Application (IPA)

ADPC will treat all information as confidential.

All fields marked with (*) are mandatory.

FacebookTwitterLinkedInEmailPrint
null

GUIDELINES FOR COMPLETING THE INDUSTRIAL PROJECT APPLICATION (I/P) APPLICATION FORM

General

Please read the below instructions before completing this Form. A separate application form is required for each project:

  • This application form can be used for Industrial Projects only. For Logistics Projects, please use the Logistics Project (L/P) Application Form. Kindly contact our staff members for other queries.
  • Please select the type of project: Free Zone or Non Free Zone. Free zone projects are generally for applicants who wish to have more than 49% ownership by non-UAE and non-GCC nationals.
  • When an entry is marked as “Optional”, you may provide the information if available.
  • Please feel free to attach additional information, studies or reports to your application form.
  • The completed Application Form must be submitted along with the required documents and processing fee.
  • For more information, please contact us at customerservice@kizad.ae , our website www.kizad.com or call us on Toll Free: +971 800102030

Section1 | Applicant Details

Please provide your contact details and relationship with the applicant company. These will be used for all future communications.

Section2 | Proposed Project Details

  • Briefly describe the industrial / production activities for your proposed project
  • List the main products and services to be offered
  • Information about Raw Materials and Output will help us better understand the supply chain of your industry
  • Volumes and capacity figures shall be based on full production capacity
  • Workforce: Indicate the number of people you will be employing at full capacity as well as the number of shifts.

Section3 | Land Requirement & Facility Details

The below table provides essential guidelines and ratios to consider when estimating the total land requirements for your project (these are guidelines only and full compliance is required with Kizad Rules & Regulations and all applicable laws and regulations).

Regulation

Maximum Permitted

Calculation Method

Maximum Floor Area Ratio (FAR)

0.44

Built-up Area / Plot Area

Maximum Height –Industries

22m, 5 stories

Measurement

Maximum Height – Warehousing

22m (up to 40m may be permitted)

Built-up Area / Plot Area

Regulation

High Impact Industries

General Impact Industries

Calculation Method

Maximum Building Setbacks

15m

6m

Measurement

Maximum Coverage (60%)

44% + 0.2% storage

Surface Exploitation / Plot Area

Section4 | Utilities

The below table illustrates the utility standards and conversion factors to assist you in estimating your project’s utilities requirements.

Utility

Definition

Standard Units & Conversion Factor

Electricity

Connected load supplied in various voltage levels
(LV, MV, HV) based on occupier demands

Standard units in Mega Watt(MW)
1 MW =1,000 kW 1 MW = 1,250kVA

Potable
Water

Drinking water used for domestic purposes
(kitchen, toilets etc.)

Standard unit is Cubic Meters per Day (m3/day)
1 m3/day = 220 GPD. Avg. consumption is 80 liters / person/ day

Process
Water

Desalinated water for industrial purposes

Standard unit is Cubic Meters per Day (m3/day). 1 m3day = 220 GPD

Natural
Gas

Natural gas for fuel use
(not for power generation).

Standard unit is Standard Cubic Feet per Day (SCFD)
1 MMBTU = 1,000 SCFD 1 Nm3/day = 35.33 SCFD

Waste
Water

No inputs are required, however, please note that the design requirements by Abu Dhabi Sewerage Services Company mandate pre-treatment and reuse/recycle of Industrial Waste Water allowing no more than 20% Process Water discharge into the ADSSC network. 90% of Potable Water discharge is permitted.

null

PROJECT
APPLICATION